Best Practices for Testing Pressure Relief Valves - MPC

Author: Minnie

Jul. 02, 2024

99 0

Best Practices for Testing Pressure Relief Valves - MPC

Table of Contents

    Safety is of the utmost importance when dealing with pressure relief valves. The valve is designed to limit system pressure, and it is critical that they remain in working order to prevent an explosion. Explosions have caused far too much damage in companies over the years, and though pressurized tanks and vessels are equipped with pressure relief vales to enhance safety, they can fail and result in disaster.

    The company is the world’s best Valve Pressure Test Table supplier. We are your one-stop shop for all needs. Our staff are highly-specialized and will help you find the product you need.

    That&#;s also why knowing the correct way to test the valves is important. Ongoing maintenance and periodic testing of pressurized tanks and vessels and their pressure relief valves keeps them in working order and keep employees and their work environments safe. Pressure relief valves must be in good condition in order to automatically lower tank and vessel pressure; working valves open slowly when the pressure gets high enough to exceed the pressure threshold and then closes slowly until the unit reaches the low, safe threshold. To ensure the pressure relief valve is in good working condition, employees must follow best practices for testing them including:

    Read on to learn more about each of the best practices for testing pressure relief valves.

    1. Perform Regular Testing on Boiler Pressure Relief Valves

    If you consider testing pressure relief valves a maintenance task, you&#;ll be more likely to carry out regular testing and ensure the safety of your organization and the longevity of your boiler. It is recommended that you test pressure relief valves at least once every six months, especially to reduce leakage caused by the buildup of minerals and corrosion. Scheduling pressure relief valve testing every six months enables you to troubleshoot issues and fix them promptly. Be sure your company documents your relief valve testing activities.

    It&#;s important to note, however, that the American Society of Mechanical Engineers (ASME) and National Board Inspection Code (NBIC), as well as state and local jurisdictions, may set requirements for testing frequency. Companies are responsible for checking with these organizations to become familiar with the testing requirements. Consider the following NBIC recommendations on the frequency for testing relief valves:

    • High-pressure steam boilers greater than 15 psi and less than 400 psi &#; perform manual check every six months and pressure test annually to verify nameplate set pressure
    • High-pressure steam boilers 400 psi and greater &#; pressure test to verify nameplate set pressure every three years or as determined by operating experience as verified by testing history
    • High-temperature hot water boilers (greater than 160 psi and/or 250 degrees Fahrenheit) &#; pressure test annually to verify nameplate set pressure. For safety reasons, removal and testing on a test bench is recommended
    • Low-pressure steam boilers (15 psi and less) &#; manually check quarterly and pressure test annually
    • Hot water heating boilers &#; manually check quarterly and pressure test annually
    • Water heaters &#; manually check every two months and replace defective valves with a new valve if a repair or resetting is indicated

    When testing the pressure relief valve, raise and lower the test lever several times. The lever will come away from the brass stem and allow hot water to come out of the end of the drainpipe. The water should flow through the pipe, and then you should turn down the pressure to stop the leak, replace the lever, and then increase the pressure.

    One of the most common problems you can address with regular testing is the buildup of mineral salt, rust, and corrosion. When buildup occurs, the valve will become non-operational; the result can be an explosion. Regular testing helps you discover these issues sooner so you can combat them and keep your boiler and valve functioning properly. If no water flows through the pipe, or if there is a trickle instead of a rush of water, look for debris that is preventing the valve from seating properly. You may be able to operate the test lever a few times to correct the issue. You will need to replace the valve if this test fails.

    2. Be Aware of the Pop-Off Pressure Point

     When testing relief valves, keep in mind that they have two basic functions. First, they will pop off when the pressure exceeds its safety threshold. The valve will pop off and open to exhaust the excess pressure until the tank&#;s pressure decreases to reach the set minimum pressure. After this blowdown process occurs, the valve should reset and automatically close. One important testing safety measure is to use a pressure indicator with a full-scale range higher than the pop-off pressure.

    Thus, you need to be aware of the pop-off pressure point of whatever tank or vessel you test. You always should remain within the pressure limits of the test stand and ensure the test stand is assembled properly and proof pressure tested. Then, take steps to ensure the escaping pressure from the valve is directed away from the operator and that everyone involved in the test uses safety shields and wears safety eye protection.

    3. Know When to Repair or Replace Pressure Relief Valves

    When you have pressure relief valves in your facility or along your pipeline system, you need to know they are functional and when to repair or replace them. By testing regularly and following a repair/replacement schedule, you&#;ll not only ensure the safety and well-being of your organization, but you&#;ll also extend the life of your valves. There are three times you should consider repairing or replacing your valves: after discharge, according to local jurisdictional requirements, and depending on their service or application.

    • After discharge &#; Because pressure relief valves are designed to open automatically to relieve pressure in your system and then close, they may be able to open and close multiple times during normal operation and testing. However, when a valve opens, debris may get into the valve seat and prevent the valve from closing properly. After discharge, check the valve for leakage. If the leakage exceeds the original settings, you need to repair the valve.
    • According to local jurisdictional requirements &#; Regulations are in place for various locations and industries that stipulate how long valves may operate before needing to be repair or replaced. State inspectors may require valves to be disassembled, inspected, repaired, and tested every five years, for instance. If you have smaller valves and applications, you can test the valve by lifting the test lever. However, you should do this approximately once a year. It&#;s important to note that ASME UG136A Section 3 requires valves to have a minimum of 75% operating pressure versus the set pressure of the valve for hand lifting to be performed for these types of tests.
    • Depending on their service and application &#; The service and application of a valve affect its lifespan. Valves used for clean service like steam typically last at least 20 years if they are not operated too close to the set point and are part of a preventive maintenance program. Conversely, valves used for services such as acid service, those that are operated too close to the set point, and those exposed to dirt or debris need to be replaced more often.

    Pressure relief valves serve a critical role in protecting organizations and employees from explosions. Knowing how and when to test and repair or replace them is essential.

    Images via Pixabay by TheoRivierenlaan and Tama66

    Pressure Test: Hydrostatic and Pneumatic Test Requirements

    Pressure tests are a non-destructive way to guarantee the integrity of equipment such as pressure vessels, pipelines, plumbing lines, gas cylinders, boilers and fuel tanks. It is required by the piping codes to confirm that a piping system is able to bear its rated pressure and it has no leaks. Pressure testing, also called hydrostatic testing, is carried out after the cooling or heating installation of any pipeline and before it is put into use.

    By performing a pressure test we find a reliable method for testing all types of pipework, including the ones in district cooling or district heating systems. This type of analysis, besides guaranteeing the right functioning, will also allow us to detect if there are leaks in a specific pipe so that reparations can be made.

    The most widely used code for pressure and leak test is the ASME B31 Pressure Piping Code. Among its several sections, the requirements and procedures listed in the codes below are followed by Araner:

    • ASME B31.1 Power Piping
    • ASME B31.3 Process Piping
    • ASME B31.5 Refrigeration Piping

    Pressure tests may be done either with liquid, usually water (hydrostatic), or with gas, usually dry nitrogen (pneumatic).  

     

    General requirements of pressure test

    1. Stress exceeding yield strength: the test pressure may be reduced to the maximum pressure that will not exceed the yield strength at test temperature.
    2. Test fluid expansion: If the test pressure is to be maintained for a period of time and the fluid in the system is subject to thermal expansion, precautions shall be taken to avoid excessive pressure.
    3. Preliminary pneumatic test: a preliminary test using air at no more than 170 kPa (25 psi) gage pressure may be made prior to hydrostatic or pneumatic testing to locate major leaks.
    4. Examination for leaks: a leak test shall be maintained for at least 10 minutes, and all joints and connections shall be examined for leaks.
    5. Heat treatment: Leak tests shall be conducted after any heat treatment has been completed.
    6. Low-test temperature: The possibility of brittle fracture shall be considered when conducting leak tests at metal temperatures near the ductile-brittle transition temperature.
    7. Personnel protection: Suitable precautions in the event of piping system rupture shall be taken to eliminate hazards to personnel in the proximity of lines being tested.
    8. Repairs or additions after leak testing: If repairs or additions are made after the leak test, the affected piping shall be retested.
    9. Test records: Records shall be made of each piping system during the testing, including:
      • Date of test
      • Identification of piping system tested
      • Test fluid
      • Test pressure
      • Certification of results by examiner 

     

    It may interest you: Industrial refrigeration: everything you always wanted to know

    Preparation for testing

    1. Exposure of joints: all joints including welds not previously pressure tested shall be left uninsulated and exposed for examination during the test.
    2. Addition of temporary supports: piping systems designed for vapor or gas shall be provided with additional temporary supports if necessary to support the weight of the test liquid.
    3. Restraint or isolation of expansion joints: expansion joints shall be provided with temporary restraint if required for the additional pressure load under test.

    Isolation of equipment and piping not subjected to pressure test: Equipment that is not to be subjected to the pressure test shall be either disconnected from the system or isolated by a blank or similar means.

    Additional resources:
    DN20 Relief Valve Grinding Machine: Comparing Top Models

    For more Valve Test Tableinformation, please contact us. We will provide professional answers.

    Figure 1: Isolation of piping

    Hydrostatic Test

    1. Test fluid: The fluid shall be water unless there is the possibility of damage due to freezing or to adverse effects of water on the piping or the process. In that case, another non-toxic liquid may be used.
    2. Provision of air vents at high points: Vents shall be provided at high points of the piping system to purge air pockets while system is filling.
    3. Pressure and procedure: The pressure limits are different for ASME B31.1 and ASME B31.3.
       

    ASME B31.1 Test Power Piping

    The hydrostatic test pressure at any point in the piping system shall not be less than 1.5 times the design pressure, but shall not exceed the maximum allowable test pressure of any non-isolated component, nor shall it exceed the limits of calculated stresses due to occasional loads.

    ASME B31.3 Test Process Piping

    The test pressure shall be not less than 1.5 times the design pressure. When the design temperature is greater than the test temperature, the minimum pressure shall be calculated by eq.  P T = 1,5P S T/S , where =allowable stress at test temperature, S=allowable stress at component design temperature, P=design gage pressure. The test pressure may be reduced to the maximum pressure that will not exceed the lower of the yield strength or 1.5 times the component ratings at test temperature. The pressure shall be continuously maintained for a minimum time of 10 minutes and may then be reduced to the design pressure and held for such time as may be necessary to conduct the examinations for leakage. Examinations for leakage shall be made of all joints and connections.

     

     

    Pneumatic Test

    1. Precautions: Pneumatic testing involves the hazard of released energy stored in compressed gas. Particular care must be taken. It is recommended to be used only when piping systems are so designed that they cannot be filled with water, i.e, refrigerant systems; or when piping systems are to be used in services where traces of the testing medium cannot be tolerated.
    2. Test fluid: The gas used as test fluid, if not air, shall be nonflammable and nontoxic, such as nitrogen.
    3. Pressure and procedure: the pressure limits and methodology is different for the codes mentioned above.

    ASME B3.1 Test Power Piping

    The pneumatic test pressure shall not be less than 1.2 nor more than 1.5 times the design pressure of the piping system. It shall not exceed the maximum allowable test pressure of any non-isolated component. The pressure in the system shall gradually be increased to not more than 1/2 of the test pressure, after which the pressure shall be increased in steps of approximately 1/10 of the test pressure until the required test pressure is reached. The pressure shall be continuously maintained for a minimum time of 10 min. It shall then be reduced to the lower of design pressure or 100 psig [700 kPa (gage)] and held for such time as may be necessary to conduct the examination for leakage. Examination for leakage by soap bubble or equivalent method shall be made of all joints and connections.

    ASME B31.3 Test Process Piping

    The test pressure shall not be less than 1.1 times the design pressure and shall not exceed the lower of 1.33 times the design pressure or the pressure that would produce a nominal pressure stress or longitudinal stress in excess of 90 % of the yield stress of any component at the test temperature. The pressure shall be increased until a gage pressure, which is the lower of 0.5 times the test pressure or 170 kPa (25 psi), at which time a preliminary check shall be made. Thereafter, the pressure shall be gradually increased in steps until the pressure is reached, holding the pressure at each step until the piping strains are equalized. The pressure shall then be reduced to the design pressure before examining for leakage. During the test, a pressure relief device shall be provided, having a set pressure not higher than the test pressure plus the lower of 345 kPa (50 psi) or 10% of the test pressure.

     

    It might interest you: Industrial refrigeration maintenance: best performance

     

    ASME B31.5 Test Refrigeration Piping

    The test pressure shall be at least 1.1 and shall not exceed 1.3 times the design pressure of any component in the system. The pressure in the system shall be gradually increased to 0.5 times the test pressure, after which the pressure shall be increased in steps of approximately 1/10 of the test pressure until the required test pressure is reached. The test pressure shall be maintained for at least 10 minutes. It may then be reduced to the design pressure and conduct the examination for leakage. During the test, a pressure relief device shall be provided, having a set pressure above the test pressure, but low enough to prevent permanent deformation of any of the system components.

    What are the benefits with outsourcing pressure testing?

    Working with a company that specializes in heating and cooling services, maintenance and testing is often more beneficial than integrating dedicated personnel inhouse, reducing cost, time, and resources.

    Other benefits of outsourcing a pressure test include:

    • Faster turnaround time
    • Increased safety for your staff
    • mproved product quality assurance
    • Decreasing repair costs
    • Minimizing risk exposure and liability claims.

     

    Discover: Benefits of District Energy: advantages of heating Heating & Cooling District

     

    Why is it important to do a pressure test with asme procedure?

    Pressure tests carried out according to the asme procedure allow us to guarantee the correct performance of the system and to detect that there are no leaks and that the installation is robust. 

    That is why it is important to consider specialised district energy contractors such as Araner. It is essential to work with top-notch, quality-oriented professionals to ensure the safety of the plant.

    ARANER, the industrial cooling engineering experts

    We are experts in designing, manufacturing and installing tailor-made industrial cooling solutions with a positive economic impact. We have worked worldwide in the development of Turbine Inlet Air Cooling, District Cooling and Thermal Energy Storage. Get in touch with our experts if you are interested in any of our solutions or if you need technical advice. We will be glad to help!    

    Contact us to discuss your requirements of Horizontal Type Testing Machine. Our experienced sales team can help you identify the options that best suit your needs.

    Comments

    0/2000

    Guest Posts

    If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

    Your Name: (required)

    Your Email: (required)

    Subject

    Your Message: (required)

    0/2000